Home  >  Classifieds  >  Announcements  >  Public & Legal Notices
Place an Ad with the Los Angeles Times!

Legal Notices: Publication The

Legal Notices: PUBLICATION The Costa Mesa Planning Commission will hold a public hearing at City Hall, 77 Fair Drive, Costa Mesa, California at 6:00 p.m. on Monday, April 23, 2018: 1. Application No.: PA-17-11 Applicant: Dr. Michael J. Beals Site Address: 55 Fair Drive Zone: I&R (Institutional and Recreational District Description: Planning Application 17-11 is a request for a Master Plan for the Vanguard University Campus. The proposed Master Plan establishes a comprehensive plan for future development at the University and is intended to supersede previous Master Plan approvals. It is anticipated that the Master Plan will accommodate up to 2,700 enrolled students (2,098 students are currently enrolled) and is comprised of at least 12 separate projects that involve the removal and/or reconstruction of buildings on the campus. The Master Plan establishes Development Areas and Development Guidelines for future buildings and related site improvements within a Master Plan framework. It is intended that the Development Areas and Development Guidelines remain fixed while allowing for the future development of buildings of various types, size and heights within these Areas, consistent with the Guidelines. The following buildings are included in the Vanguard University Campus Master Plan: Project A: Gym/Events Center-This project replaces the existing gymnasium and provides facilities for Vanguard's athletics program. The center court will also transform into an events center for the campus to gather during planned events. This facility removes parking (existing Lot K) that is currently internal to the campus. An outdoor space/quad will be created to the east of the facility, connecting this building to the campus core and improving pedestrian circulation. Project B: Student Center-This project removes the existing Cafe and Cove/Bookstore on campus, replacing them with a Student Center. The development area for this facility includes the removal of parking lot L. The perimeter road that connects Vanguard Way to parking lot M will remain. Project C: Maintenance & Operations/Warehousing-This project relocates facilities for maintenance and operations to the southwest corner of the University. This will create a new access point to the campus for deliveries. Deliveries will enter from Vanguard Way, directly to the facility. Campus vehicles will distribute materials as needed throughout the campus. Project D: Stem & Kinesiology-This project replaces antiquated Science, Technology, Engineering, Math and Kinesiology facilities on campus. The project is planned in two phases within one development area along Newport Blvd. Because of the location of the existing Smith Building, Phase 1 will ideally retain the facility, while Phase 2 will require the demolition of Smith Building. In addition to the academic facilities, limited parking and a service road will connect the North and South parking lots along Newport Blvd. This project will remove parking lots E & F. Project E: Multi-Disciplinary Academic Building-This project locates a new academic facility south of Scott Academic Center and west of Heath Academic Center. This project will replace existing modular offices and classrooms and provide permanent classrooms and offices. Project F: Learning Resource Center-This project locates a new Learning Resource Center (LRC) along the south edge of the campus core. The new LRC will replace the existing library. Project G: Student Housing-This project locates a Student Housing facility east of the new LRC. This facility could accommodate approximately 300 students depending on design and room size. Project H: Central Plant-This project locates a central plant on campus. Depending upon further engineering studies, the following sites within the Institutional Areas would be considered: Project A (Gym/Events Center), Project B (Student Union), Project D (STEM & Kinesiology). Project I: Athletics-This project identifies ongoing improvements to the athletic facilities. Project J: North East Parking-This project creates a new front entry for Vanguard University. Relocating the primary entry drive to the east allows direct access for vehicles to move into the parking lot and provides a formalized campus drop-off. The project also removes open space and re-organizes parking lots C and D. Project K: Parking Structure-This project removes parking lots H and G, locating a parking structure along Newport Blvd. Project L: Campus Beatification/Infrastructure-This project addresses ongoing site improvements on campus. Environmental Determination: An Initial Study/Mitigated Negative Declaration (IS/MND) was prepared for the project and a Notice of Intent to Adopt the IS/MND was previously published in accordance with the Lead Agency's Guidelines implementing the California Environmental Quality Act (CEQA). The IS/MND is available for public review and comment from March 19, 2018 to April 18, 2018. The IS/MND and supporting documents are available for review during normal business hours at the following locations: (a) City of Costa Mesa, Public Counter, 77 Fair Drive, Costa Mesa, CA, (b) Mesa Verde Library, 2969 Mesa Verde Drive, East, (c) Costa Mesa/Donald Dungan Library, 1855 Park Avenue, and can be viewed on the City's webpage at www.costamesaca.gov under the Development Services Department/Planning Division heading for environmental documents. The IS/MND found that the environmental effects from the project would be less than significant with the incorporation of standard conditions of approval, mitigation measures and compliance with the Code requirements. The proposed project site is not on a list compiled pursuant to Government Code Section 65962.5. 2. Application No.: PA-17-46 & Tentative Tract Map No. 18149 Applicant: Pison Netsawang Site Address: 1966 Wallace Avenue Zone: R2-HD (Multiple-Family Residential, High Density) Description: Planning Application 17-46 is a request for: 1. Design Review for the construction of five, two-story, detached single-family residences on an 18,418-square-foot lot in the R2-HD zone. Each single-family residence is approximately 2,200 square feet and includes 2 beds / 2.5 baths with an attached two-car garage. The project satisfies all Small Lot Subdivision development standards and the Residential Design Guidelines. 2. Tentative Tract Map No. 18149 - Subdivision of an 18,418-square-foot lot into five separate parcels consistent with the Small Lot Subdivision Ordinance. Environmental Determination: The project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under CEQA Guidelines Section 15332 (Class 32), In-Fill Development Projects. 3. Application No.: PA-17-48 (PA-08-27 A2) Applicant: Dan Stansell Site Address: 1872 Newport Boulevard Zone: C2; General Business Description: Planning Application 17-48 (PA-08-27 A2) is a request for an amendment to Conditional Use Permit PA-08-27 for a jewelry store, with ancillary pawnbroker services, (Jewelry-N-Loan), to remove previously-approved conditions of approval #10 and #13. These conditions relate to limits on loan amounts and required security measures. Environmental Determination: The project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under CEQA Guidelines Section 15301 (Class 1), Existing Facilities. 4. Application No.: PA-18-10 & TPM 2018-114 Applicant: Chris White Site Address: 170 Cabrillo Zone: R2-HD (Multiple-Family Residential, High Density) Description: Planning Application 18-10 is a request for: 1. Design Review to construct a two-unit small lot subdivision on an 8,507-square-foot parcel in the R2-HD zone. Two two-story detached single-family homes, each with an attached two-car garage, are proposed and are 2,857 and 3,001-square-feet in size. The development meets all Small Lot Subdivision development standards and the Residential Design Guidelines. 2. Tentative Parcel Map No. 2018-114 to subdivide an 8,507-square-foot parcel into two separate residential parcels consistent with the Small Lot Subdivision Ordinance. Environmental Determination: The project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under CEQA Guidelines Section 15303 (Class 3), New Construction. Additional Information: For more information, call (714) 754-5245, or email PlanningCommission@costamesaca.gov or visit the Planning Division on the Second Floor of City Hall, 77 Fair Drive, Costa Mesa, California. The Planning Division is open 8:00 a.m. to 5:00 p.m. Monday through Friday, except specified holidays. A copy of the staff report can be viewed on the City's website: www.costamesaca.gov 72 hours prior to the hearing date. All interested parties may appear and present testimony in regard to this application. If you challenge this project in court, you may be limited to raising only those issues you, or someone else raised, at the public hearing or in written correspondence delivered to the City, at or prior to, the public hearing. Any written correspondence or other materials for distribution to the Planning Commission must be received by Planning Division staff prior to 3:00 p.m. on the day of the hearing.

Additional Information

Posted:
1 week, 1 day, 5 hours ago
Category:
Public & Legal Notices